ScottishPower calls its export tariffs SmartGen, and there are three: SmartGen for anyone, SmartGen Premium for its own electricity customers, and SmartGen Premium Plus for customers whose panels or battery it also installed. All three are variable. Its page is one of the few that tells you plainly that the readings are your job, and that you will not be paid without them.

ScottishPower's export tariffs

ScottishPower's Smart Export Guarantee tariffs, best first within each group, with who can take each one
TariffRateWho can get itFixed or variableGroupChecked
SmartGen6p/kWhAnyoneVariableOpen to anyone2026-09-28
SmartGen Premium12p/kWhScottishPower electricity customersVariableFor that supplier's electricity customers2026-09-28
SmartGen Premium Plus15p/kWhScottishPower installed the system and supplies the electricityVariableWhere that supplier installed the system2026-09-28
The receipt

6p/kWh
pence per kWh exported
Page dated 2 August 2025.

Source: ScottishPower · checked 2026-09-28 · JSON

The receipt

12p/kWh
pence per kWh exported
Page dated 2 August 2025.

Source: ScottishPower · checked 2026-09-28 · JSON

The receipt

15p/kWh
pence per kWh exported
Page dated 2 August 2025.

Source: ScottishPower · checked 2026-09-28 · JSON

How ScottishPower compares with every other supplier

We keep every supplier's export rates in one table, each read from that supplier's own page. Here is where ScottishPower's rates sit in it, group by group, because a rate only means something against the others you could actually have.

The ranks and the differences in pence are our comparison from the table as we last read it, not figures ScottishPower publishes. Rows paying the same rate share a place. Time-of-use and wholesale-linked tariffs anywhere in the table are left out of the ranking, because they have no single rate to rank. The rate open to anyone runs from 2p/kWh to 13p/kWh across the whole table.

What you need before you apply

As ScottishPower's own pages put it, in our words:

How to apply, as ScottishPower describes it

  1. Apply online from ScottishPower's page, uploading the installer's certificate, proof that you own the system, and photos of your meters. Your installer will not do this for you: ScottishPower says the application is yours to make.
  2. ScottishPower validates the application and checks that your meter can record half-hourly readings. It puts this at up to 14 days.
  3. Your network operator creates the export MPAN, the meter number for exported electricity. ScottishPower puts this at 1 to 2 weeks.
  4. You register your payment details, which it puts at another 1 to 2 weeks. It says the whole process can take up to 6 weeks, and that a new application is paid from the date you applied.
  5. Payment then comes every 90 days, the first about 90 days after your contract starts. You have to submit your export reading online every 6 months, or ScottishPower says it cannot pay you.
  6. You have 14 calendar days from applying to change your mind and cancel.

You apply on ScottishPower's own site. We do not take applications, we do not ask for your details, and nobody pays us for sending you there.

The receipt

Three variable export tariffs: SmartGen for anyone, SmartGen Premium for ScottishPower electricity customers, SmartGen Premium Plus where ScottishPower also installed the panels or battery
supplier page summary
The source page carries no date. Read 28 September 2026.

Source: ScottishPower · checked 2026-09-28 · JSON

Is ScottishPower obliged to offer this?

Ofgem lists ScottishPower Energy Retail Limited as a mandatory SEG licensee for 1 April 2026 to 31 March 2027. Ofgem publishes which suppliers have told it they are taking part in the Smart Export Guarantee each year. The big ones have no choice: a supplier with enough household customers must offer a tariff. Smaller ones can volunteer.

The receipt

Mandatory SEG licensees: British Gas Trading Limited; E (Gas and Electricity) Ltd; E.ON Next Energy Limited; EDF Energy Customers Limited; Electricity Plus Supply Limited (trading as Utility Warehouse); Foxglove Energy Supply Limited; Fuse Energy Supply Limited; Octopus Energy Limited; OVO Electricity Ltd; ScottishPower Energy Retail Limited; So Energy Trading Limited; Utilita Energy Limited. Voluntary: Pozitive Energy Ltd; Ruby Electricity Ltd; Smart Pay Energy Ltd; Voltx Power Ltd
suppliers that told Ofgem they are SEG licensees for the SEG year
Covers 1 April 2026 to 31 March 2027.

Source: Ofgem · checked 2026-09-28 · JSON

Ofgem's rule is that your export payments, your electricity supply and your gas supply can each be with a different company. So you can take an open-to-anyone export tariff from one supplier and keep buying your electricity from another. The catch is in the table: the higher rates are mostly reserved for that supplier's own customers, so switching your export alone gets you the open tier.

The receipt

You can use one company for export payments and another for your electricity supply
scheme rule
The source page carries no date. Read 28 September 2026.

Source: Ofgem · checked 2026-09-28 · JSON

The same page for other suppliers: Octopus, British Gas, EDF and E.ON Next.

Questions people actually ask

What is the Scottish Power SmartGen rate?

SmartGen pays 6p/kWh and is open to anyone who meets the scheme's rules, whoever supplies their electricity. SmartGen Premium pays 12p/kWh to ScottishPower electricity customers, and SmartGen Premium Plus pays 15p/kWh where ScottishPower also installed the panels or battery. All three are variable, and ScottishPower's page dates the current rates to August 2025.

What is SmartGen Premium?

ScottishPower's export tariff for its own electricity customers, paying 12p/kWh. ScottishPower must supply your import electricity at the same address as the installation. Its page says a customer can move their supply elsewhere and still be paid for export by ScottishPower, but it does not say which tariff you would then be on, and Premium needs ScottishPower supply.

Do I need to be with Scottish Power to get SmartGen?

No. ScottishPower's page says your electricity does not need to be supplied by ScottishPower for you to receive SEG payments from it. That gets you SmartGen at 6p/kWh. The two Premium tariffs need ScottishPower supply.

How long does a Scottish Power SEG application take?

Up to 6 weeks, by ScottishPower's own account: up to 14 days to validate the application, 1 to 2 weeks for the network operator to create the export meter number, then 1 to 2 weeks to register your payment details. A new application is paid from the date you applied, so the wait does not cost you the export.

How often does Scottish Power pay for SmartGen?

Every 90 days, with the first payment about 90 days after your contract starts. The condition people miss: you must submit your export meter reading online every 6 months, or ScottishPower says it will not be able to pay you.